Well, I finally got most of the plubming done, at least the plumbing to the sump. I had a little issue w/ the 1.5" returns from the mag 9.5 pump, so I ended up scrapping it to go w/ 3/4" instead. I know this will limit the flow (according to the flow calculator ~ 200 gph) but the majority of the flow in the tank will be handled by my CL and penductors. The mag pump is a little noisy, at least more noisy then I remember it being. I tried to put a small mouse pad underneath it, but it seems to be transferring the noise and vibration to the pipe. Should I install a small portion of flex pvc to help this?
I still have to install the CL and the skimmer plumbing, but I'm waiting on some spa flex glue. I hung the light brackets as well.
And on to the pictures.
Light brackets:
Light brackets mounted 18" above the tank:
Closed loop over the top plumbing plan:
Left side plumbing:
Right side plumbing:
**Both drains are separate, left side goes to the skimmer compartment and the right side goes to the fuge.**
Full frontal:
A little farther back:
Bracket to hold the top-off water, ca reactor return, etc.
Here is the bracket placed:
Chris