New 150 Setup in Progress

OH CRAP! I was thinking about the plumbing project late last night & it hit me.........I plumbed the 4 way wrong. I ran it the lines that were headed to the nearest bulkhead. that will make it push water to 1 front corner & 1 back corner. NOT what I wanted! It should be so the 2 fronts are on, then the 2 backs on. So I will have to back up & do a little changing.....O well.....I am going to get rid of some 90's too......I took quite a beating about those from some members :)..........but they are right I had too many 90's, should have used 45's.
 
Finally finished the tile floor.....guess the wife won:)

01FK7254.jpg
 
Dang nice job on the floor. I've done a bit of tile work myself and the knees don't care for it too much. Looks like the tank is coming along. Keep us posted! :)
 
Drummer.........you know my back & knees are sore from that tile! Wont take on another one of those till I forget the pain!:rollface:
 
Thanks, Leebo! RO/DI water has been running for 2 days......Im getting about 4 gal per hour, tank & sump take approx. 230 gallon. Will post more pics soon.
 
<a href=showthread.php?s=&postid=9678631#post9678631 target=_blank>Originally posted</a> by FATTIRE280
Drummer.........you know my back & knees are sore from that tile! Wont take on another one of those till I forget the pain!:rollface:

Nice. :lol:
 
Back
Top