Well got some plumbing done today. Decided to go herbie as super quiet so have to run return over the top. Need to add some pipe clamps to return pipe under tank to secure pipe and 1 piece for drain pipe off the gate valve. Should finish plumbing tomorrow then start adding power strip and possibly hang lights. Wed if all goes well add water rock and sand.
 