I'm about to start plumbing my first sump system. It's a custom 200g with a herbie center overflow.
Here is what I'm thinking. Please tell me what issues or suggestions you might have. Thanks in advance.
MAIN DRAIN: 2in bulkhead
-PVC to union
-From union run PVC to Spears gate valve (highest end I can find)
-PVC to union
-From there run flexi PVC to sock
EMERGENCY DRAIN: 2in bulkhead
-PVC straight down into sump (probably need an elbow or two but I figure it doesn't really matter where this one dumps within the sump since it's just emergency)
RETURN: 2x1.5in bulkheads
-PVC down from each to a union on each
-Flexi PVC to t-joint.
-T-joint PVC to a large check valve (sump can handle flow back but I figure this is still a good idea)
-PVC to union
-PVC to pump
So I'm trying to put unions wherever it makes sense. I also don't know if I should be installing any ball valves anywhere on the return. I was thinking making at the bottom? Or at the top straight off the two lines?
Thanks for the help y'all.
Here is what I'm thinking. Please tell me what issues or suggestions you might have. Thanks in advance.
MAIN DRAIN: 2in bulkhead
-PVC to union
-From union run PVC to Spears gate valve (highest end I can find)
-PVC to union
-From there run flexi PVC to sock
EMERGENCY DRAIN: 2in bulkhead
-PVC straight down into sump (probably need an elbow or two but I figure it doesn't really matter where this one dumps within the sump since it's just emergency)
RETURN: 2x1.5in bulkheads
-PVC down from each to a union on each
-Flexi PVC to t-joint.
-T-joint PVC to a large check valve (sump can handle flow back but I figure this is still a good idea)
-PVC to union
-PVC to pump
So I'm trying to put unions wherever it makes sense. I also don't know if I should be installing any ball valves anywhere on the return. I was thinking making at the bottom? Or at the top straight off the two lines?
Thanks for the help y'all.