I'm drilling my tank for my intake which is going to have 2 intakes as well as an emergency overflow. My question is on the return, should I drill it or just go over the top, with a siphon break, to prevent backflow in the event of a power outage? I've considered drilling and installing some type of check valve but have heard pros and cons.