rjjr1963
New member
WIP on my saltwater station.
My stand is done and I only mis-cut one board. The plumbing is run through the ceiling. This was the toughest part and I got bloody knuckles to prove it, lol. Finally the RO/DI unit is mounted and two 20 AMP electrical circuits have been wired up. The station is in a spare bedroom and the RO/DI unit is in a utility room behind the tank. Today is plumbing day and if all goes well I'll be filling water tanks.



My stand is done and I only mis-cut one board. The plumbing is run through the ceiling. This was the toughest part and I got bloody knuckles to prove it, lol. Finally the RO/DI unit is mounted and two 20 AMP electrical circuits have been wired up. The station is in a spare bedroom and the RO/DI unit is in a utility room behind the tank. Today is plumbing day and if all goes well I'll be filling water tanks.



Last edited by a moderator: