Ok so I picked up my sump today from ND. There was a problem with the tank and I'm getting it next week. This is the rough layout but without the ATO section (got my own tub)
The first section I plan on fitting socks and my skimmer, the second a refuge with cheeto or the like. Obviously the last section will be the return pump but there will also be some spare room there.
I also have Vecton 600 UV steriliser and a DnD phosphate reactor with pump. Now I want to add these into the system, but wanted advice as to how. I know some spur off the return line and therefore use the return pump as the power into these devices, and I will probably have to with the UV steriliser, but how can I loop these into my system, in what order, to make it look good and be effective at what it does?
Likewise, regardless of where the inputs come from, where do I have the returns from these two devices? I mean what chamber? Back to the beginning?
All advice welcome asap as I need to tell them what piping in need for all this before Monday. Thanks.
Sent from my iPhone using Tapatalk
The first section I plan on fitting socks and my skimmer, the second a refuge with cheeto or the like. Obviously the last section will be the return pump but there will also be some spare room there.
I also have Vecton 600 UV steriliser and a DnD phosphate reactor with pump. Now I want to add these into the system, but wanted advice as to how. I know some spur off the return line and therefore use the return pump as the power into these devices, and I will probably have to with the UV steriliser, but how can I loop these into my system, in what order, to make it look good and be effective at what it does?
Likewise, regardless of where the inputs come from, where do I have the returns from these two devices? I mean what chamber? Back to the beginning?
All advice welcome asap as I need to tell them what piping in need for all this before Monday. Thanks.
Sent from my iPhone using Tapatalk