Ok guys I am finishing up the Kalk Reactor and here are the recent photos:
Glued both flanges together to the tube:
Here I am making some wedges to hold the tube that will run fresh water down to the bottom of the reactor:
I then drilled holes in the wedges to hold the tube and glued the wedges to the side of the reactor:
I started back on the top flange and drilled a hole in the middle to insert a PVC union:
I then drilled two more holes for the hoses, used a tap to thread the top, and screwed the quick connect flanges to the top:
I then started to focus on the pump connection attached are some of the PVC parts used to make my connections. I quickly found out that when using two PVC unions you need to allow for the space for each union. So I added a space pipe which you will see on the next picture below this one:
Beware!!!!! Put the Union flange on this above piece prior to gluing. I forgot them and had to break my connections and reattach them...... DOH!!!
I then lined up the pump flanges to the tube, marked my locations the flanges will be made up to the tube, drilled the holes, and started gluing the PVC union to the tube. This is where I am at today......
TAMU Reef