It took about 8 days total work. I had to strip my tile roof and re-paper it, upgrade the electrical panel, install mounts,racks,inverters,ground the system, install solar panels. Also had to pass inspections. This was spread over 1 1/2 months. Plus the weather was in the high 90's when I did this = half days. Just to hot to be up on the roof. Just your typical weekend stuff :hmm6: