Lordhelmet
Active member
i got the word from the man himself about what is going on over there.
The city had them engineer their tanks seizmic stabilty. and i guess it took them about a week for the engineer who was drawing them up to get them something practical that you can show fish in and be safe. after that was done the city OK'd it and they started the installation. it is a huge undertaking and it will take them around 4 days because of the large # of supports and the large size of the supports.
They hope to have an eta of the end of next week but things can happen so it isn't written in stone.
Now the good news. the old location is open for just fish right now. it will have the same hours as the other store untill they move the livestock to the new location. the new location has all the feed and premixed water. FYI
Chris
The city had them engineer their tanks seizmic stabilty. and i guess it took them about a week for the engineer who was drawing them up to get them something practical that you can show fish in and be safe. after that was done the city OK'd it and they started the installation. it is a huge undertaking and it will take them around 4 days because of the large # of supports and the large size of the supports.
They hope to have an eta of the end of next week but things can happen so it isn't written in stone.
Now the good news. the old location is open for just fish right now. it will have the same hours as the other store untill they move the livestock to the new location. the new location has all the feed and premixed water. FYI
Chris