ZOKU
Resident Ninja
Hello,
I'm in the midst of setting up a 40B project and am currently collecting equipment for it. I am going to be obtaining an Apex LITE controller and plan on utilizing NON-controllable powerheads to begin with. Down the road, I will plan on upgrading to the controllable line.
I plan on using a 6025 on the left, a 6025 on the right and a 6015 on the back wall of the tank for added variable / cross-current.
My question is how should I cycle these through the Apex LITE? I know the non-controllable ones aren't keen on being cycled on/off at frequent intervals. But how frequent is too frequent? 5 min? 10 min? I don't want to ruin these powerheads by utilizing them with my Apex.
I'm in the midst of setting up a 40B project and am currently collecting equipment for it. I am going to be obtaining an Apex LITE controller and plan on utilizing NON-controllable powerheads to begin with. Down the road, I will plan on upgrading to the controllable line.
I plan on using a 6025 on the left, a 6025 on the right and a 6015 on the back wall of the tank for added variable / cross-current.
My question is how should I cycle these through the Apex LITE? I know the non-controllable ones aren't keen on being cycled on/off at frequent intervals. But how frequent is too frequent? 5 min? 10 min? I don't want to ruin these powerheads by utilizing them with my Apex.