Update to my build tread....Finally.

Flooring is down. Trim is down and nail holes are filled. Painting trim this week. Christmas tree is in the tanks spot per the wife. Doors are built for the stand. Talking with a cabinet maker about getting the canopy built. Things are actually moving along.
 
Trying to figure out how to put my new rock in the system. Should I just put it in and only allow a lil flow through the DT or put it in and see what happens. I'm nervous about it cycling but I don't think that it can cycle to much with all of the current rock and water in my current system I will be effectively doubling the water amount though.
 
Back
Top