Tank has received its final silicone seal. We want to do another final coat inside the overflow box tonight, or maybe tomorrow. Teleposts will be in next Saturday, so we can pick them up when we are ready to do so.
We need to find 3 5g buckets for the drilling portion of the build. I've had no luck so far with our local board, but hopefully someone will offer some up for sale or trade soon.
The tank lifting party will be Sunday, May 4th, and by that time the tank should be drilled and the floor should be reinforced, allowing us to add water shortly thereafter.