I'm happy to hear this because having styro cut would just be one more thing to do!!
Now, on to the next question...
I need to drill my fuge tomorrow. The fuge will be above the sump being fed from a Tee in the return line. It will then drain via gravity back to the sump. Q: Where do i drill the holes??? Do i want the inlet higher than the drain or the same height? It's a 30g (15" tall) so I thought that I would drill around 2/3 to 3/4 up? Back to the main question...should they be the same height or should one be higher or lower than the other?
Also, I bought the cable to hang my light. How much space between the light and the tank should there be? Once I clamp the cable together, there is no moving it, so i want to do it right the FIRST time.
Thanks, Mike