We have been working on it for a cpl of months. Started off building a room for the sump set up. Its a stack of 3 70 gal tanks for a fuge, grow out and sump, a 70 gal QT tank, chillers, skimmer and all the other crap associated with the new tank. Cut the floor for the drain, had to lay tile, FRP walls, run a separate service for the room with 6 GFCI individual breakers. It all takes me too much time. The tank will be about 47' of pvc away.