Fish4Me2
New member
More progress to report. Tonight I got the plugs to allow me to run the halides through the wall wired up. Here's the pictorial:
Step 1, take deep breath and cut wires:
Step 2, use tool to slit open outer layer of wires:
Step 3, strip wires:
Step 4, twist and tin wires:
Step 5, wire plugs:
Step 6, rinse and repeat until all 3 fixtures are done!
I followed that up by running the ends of the wires from the ballasts through the wall and adding plugs. The bad news is that when I plugged the ballasts into my EB4 HD, which is plugged directly into the new GFI circuit the electrician ran, the GFI tripped. This was even though all the outlets on the EB4 HD were set to off via the Apex controller, and indeed showed no power when tested. I unplugged it all for the night and will investigate more later.
Step 1, take deep breath and cut wires:
Step 2, use tool to slit open outer layer of wires:
Step 3, strip wires:
Step 4, twist and tin wires:
Step 5, wire plugs:
Step 6, rinse and repeat until all 3 fixtures are done!
I followed that up by running the ends of the wires from the ballasts through the wall and adding plugs. The bad news is that when I plugged the ballasts into my EB4 HD, which is plugged directly into the new GFI circuit the electrician ran, the GFI tripped. This was even though all the outlets on the EB4 HD were set to off via the Apex controller, and indeed showed no power when tested. I unplugged it all for the night and will investigate more later.