I guess it's all relative... to me, the first link looks MUCH easier. Either way, you have to get 2 power sources (city power and generator power) into the transfer box, then the power must be routed through the transfer box to the circuts that you would like to power.
Personally I like the fact that the Square D box is the same manufacturer as the existing main breaker box that I have in my house. I like consistency. Again, personal preference.
-Scott
Personally I like the fact that the Square D box is the same manufacturer as the existing main breaker box that I have in my house. I like consistency. Again, personal preference.
-Scott