Hi I am in the process of setting up a CAD Lights 92G Versa series tank but I not sure what direction to go for the drain / overflow setup. The tank was made with a side corner overflow with a 1" and 1/2" bulkhead. I had CAD lights drill another bulkhead but they added another 1/2" Bulkhead.
My question is with this 3 bulkheads I have whats the best drain setup to run? I am worried if a run a Herbie setup with a 1" siphon with 1/2" return and emergency that there will not be enough flow. Should I enlarge the 2 holes to fit 3/4" Bulkhead or that wont matter? Thanks for any advice.
My question is with this 3 bulkheads I have whats the best drain setup to run? I am worried if a run a Herbie setup with a 1" siphon with 1/2" return and emergency that there will not be enough flow. Should I enlarge the 2 holes to fit 3/4" Bulkhead or that wont matter? Thanks for any advice.