Yeah!!! The DSL guy came today and I'm all wired up again... That dial up was going to kill me
I managed to get the rough-in of the plumbing mostly done today. I got the return lines from the sump into the tank, but I still need to tie them into the pipes in the crawl space.
I also got the OM 4-way roughed in. I was kind of going on a wing and a prayer getting this thing in there. I had to make sure the lightrack would still fit and I would have enough room to reach in the tank when needed.
So here is a shot of the basics. You can also see the vent hole going outside, just behind the 4-way.
A slightly different view...
The plumbing is OK here, it's me that's crooked
And the pump... Going to give it a test run here... If it's loud it's going to go in the crawl space.
So I have a meeting today, so I'm going to clean up and call it quits. But tomorrow I'm looking at getting the paint done and finalizing the plumbing. I may do a quick wet test with some tap water to make sure that the OM plumbing is good