Alternating 6155 on/off with Apex

Neroon

New member
I think this is okay, but I want to confirm first. Is it acceptable to alternate two 6155s from 0% to 80% power on a five or ten minute cycle? The Apex documentation says not to run them less than 30%, but I assume 0% is fine. Thank you.
 
Yes 0 is fine, you just do not want to go from 1-29%. Also when using a controller you should turn the pump to max speed via the white dial on the junction box
 
Back
Top