Another Jebao Group Buy (WP & DC) - (SWFMAS) Must pick up to participate

Status
Not open for further replies.
OK So I finally received an email from Jebao. Here is the deal, I can add the Twin Controllers to the order but I cannot make any changes as far as removing anything from the order since it has already been submitted since they left for vacation and the payment was made, therefore I can only add the twin controllers to the order.

They have 3 different model of twin controller and each comes with the plug and adapter. Each model allows you to control a different pair of pumps. Bellow is the list with prices.

TC-4A - WP25p+WP25p - WP25p+WP10p - WP10p+WP10p - $32 each

TC-5A - WP40p+WP40p - WP40p+WP25p - WP40p+WP10p - WP25p+WP25p - $50 each

TC-6A - WP60p+WP40p - WP40p+WP40p - WP40p+WP25p - WP25p+WP25p - $60 each

Again this is ONLY the controller with plug and adapter it does NOT come with a WP pump like the packages that Fish-Street is offering.

If anyone is interested in purchasing a controller I need to know which model and need funds sent to me by Sunday 02/16/2014 @ 11:59pm as I will be send the money on Monday morning.

Please send the money to my paypal as gift and in the description write your username from Reef Central and the model and quantity of twin controllers.

enoa@edison.edu

On fish streets website it says with regards to the dual controller if you already have wp pumps you must get a new power supply or the old one will fry. Does this apply to us since we ordered the pumps and controller separately? I was just curious so if I need to I can order it from fish street before our pumps come in.- thanks
 
Been waiting for the answer on the controllers and wanted to add one to my order... didn't realize that I'd only have two days to decide. Didn't get a chance to check the thread over the weekend. Oh well.

Sorry but it had to be done quick because they are already behind and waiting a week or so for everyone to decide if they wanted controllers or not would had been too long.
 
On fish streets website it says with regards to the dual controller if you already have wp pumps you must get a new power supply or the old one will fry. Does this apply to us since we ordered the pumps and controller separately? I was just curious so if I need to I can order it from fish street before our pumps come in.- thanks

No. The reason why fish street says that is because you can either buy just the twin controller from them with no power supply or you can buy it with the power supply, what they mean is that if you already own a pair of wp25's and decide to get the twin controller without the power supply and intend on using one of the power supply from your wp25 to operate the twin controller that will fry the wp25 power supply because its only intended to run one pump not two.

The twin controller comes from the factory with the power adapter needed to run two pumps, no need to order an extra power supply from fish street.
 
UPDATE:


I emailed Jebao last night asking for an ETA and the news are not so good. They are short staffed and have a lot of orders that came in before the Chinese holiday (including our order) so right now they are expecting the order to be completed in 4-5 weeks. Keep in mind that our order was submitted before they left in January but they didn't start working on it till they came back which was last week.

All we can do is be patient as this part of the process is out of our control. Any news I get will be posted here.
 
No. The reason why fish street says that is because you can either buy just the twin controller from them with no power supply or you can buy it with the power supply, what they mean is that if you already own a pair of wp25's and decide to get the twin controller without the power supply and intend on using one of the power supply from your wp25 to operate the twin controller that will fry the wp25 power supply because its only intended to run one pump not two.

The twin controller comes from the factory with the power adapter needed to run two pumps, no need to order an extra power supply from fish street.

ahh I see thank you
 
UPDATE:


I emailed Jebao last night asking for an ETA and the news are not so good. They are short staffed and have a lot of orders that came in before the Chinese holiday (including our order) so right now they are expecting the order to be completed in 4-5 weeks. Keep in mind that our order was submitted before they left in January but they didn't start working on it till they came back which was last week.

All we can do is be patient as this part of the process is out of our control. Any news I get will be posted here.

Thanks for the update Eric.
 
UPDATE:


I emailed Jebao last night asking for an ETA and the news are not so good. They are short staffed and have a lot of orders that came in before the Chinese holiday (including our order) so right now they are expecting the order to be completed in 4-5 weeks. Keep in mind that our order was submitted before they left in January but they didn't start working on it till they came back which was last week.

All we can do is be patient as this part of the process is out of our control. Any news I get will be posted here.

oh no, But thanks for the Update,

Guess I can take my time staining the new stand and canopy ..Maybe I can wet sand and buff it for that new car shine.
 
UPDATE:


I emailed Jebao last night asking for an ETA and the news are not so good. They are short staffed and have a lot of orders that came in before the Chinese holiday (including our order) so right now they are expecting the order to be completed in 4-5 weeks. Keep in mind that our order was submitted before they left in January but they didn't start working on it till they came back which was last week.

All we can do is be patient as this part of the process is out of our control. Any news I get will be posted here.

Thanks for the update.

I missed the post about adding the controller and want to add one to my order. since they are delayed another 4-5 weeks, surely they can still add the controllers?
 
Thanks for the update.

I missed the post about adding the controller and want to add one to my order. since they are delayed another 4-5 weeks, surely they can still add the controllers?

Sure I can add whatever I want but the only issue with that is that I would need to transfer the funds to them for whatever I added. I've already made two transfers, one for the order of the pumps and one today for today for the twin controllers and I won't be making a third transfer because there are some fees associated with each wire transfer and I just don't see the benefit in paying a $45 wire transfer fee for one or two controllers.

I will be doing another group buy in the near future because Im getting tons of PM's about doing another group buy so kept an eye out for that thread.
 
Sure I can add whatever I want but the only issue with that is that I would need to transfer the funds to them for whatever I added. I've already made two transfers, one for the order of the pumps and one today for today for the twin controllers and I won't be making a third transfer because there are some fees associated with each wire transfer and I just don't see the benefit in paying a $45 wire transfer fee for one or two controllers.

I will be doing another group buy in the near future because Im getting tons of PM's about doing another group buy so kept an eye out for that thread.

Any way I could get a pm when you do the next group buy
 
Can anyone give me a link for what these are. I need power heads for my nue tank 260 G and sump etc
 
Status
Not open for further replies.
Back
Top