Closser
New member
Hello everyone,
I've just installed a float switch in my display tank to control an aqualifter through the Apex. The float is shielded by a medicine bottle with holes drilled into the bottom to protect it from the Vortec. Following the lead of the unofficial user's guide (thanks!) I used included the "defer" command in my programming for the outlet powering the aqualifter.
Fallback OFF
If Switch1 OPEN Then OFF
If Switch1 CLOSED Then ON
If FeedA 060 Then OFF
Defer 030:00 Then ON
My question is: What time length would you recommend for the defer command? I'm new to all of this...:headwally:
Thanks all!
I've just installed a float switch in my display tank to control an aqualifter through the Apex. The float is shielded by a medicine bottle with holes drilled into the bottom to protect it from the Vortec. Following the lead of the unofficial user's guide (thanks!) I used included the "defer" command in my programming for the outlet powering the aqualifter.
Fallback OFF
If Switch1 OPEN Then OFF
If Switch1 CLOSED Then ON
If FeedA 060 Then OFF
Defer 030:00 Then ON
My question is: What time length would you recommend for the defer command? I'm new to all of this...:headwally:
Thanks all!