Ok, I know this is going to be a mixed answer, but how long do most people take for an entire build?

Ive been working on my build now for about 6 months, still not near as close as I would like to be! LOL
 
Im 3 months into my 150g build. About 3/4 done now.
263f717ef192cea1effbced7e9110154.jpg



Sent from my iPhone using Tapatalk
 
I've been collecting equipment and such for a year. Finally got to the point I am doing my plumbing. This has taken serveral weeks. Just finished the drain today. Going to get the emergency drain on the next few days. The manifold is done but not installed. I finished the rock work last week. The tank is a third full of water. There is a heater and powerhead to warm what is in there to heat and mix the salt in the water. I am taking my time and doing it once.
 