I did consider doing that. However, the MJ1200 is pushing through around 18 feet of line, the reactor with a check valve, and about 3 feet or vertical rise. By the time it comes out of the line in the sump, its nearly at a drip. Also, it's dumping into the 2500 gph return of the display so it gets mixed very well.