Alright, so I haven't had too much time to work on the room, but the room is 100% primed and 98% painted, all that is left is to paint the "doors" and the corners where the roller brush couldn't get. Hopefully by next weekend I will be installing the electrical as well start building the stand for water storage tanks and the quarantine/hospital tanks. So here is the room as of tonight:
The paint I used:
PS: sorry if the pictures are a little blurry, my hands are shaky and tired.
The paint I used:
PS: sorry if the pictures are a little blurry, my hands are shaky and tired.