In preparation for the 240 which should be delivered sometime in April, I am putting in three new outlets on a dedicated circuit. Two near the floor for the sump and one near the ceiling for the lights. There is already one outlet by the floor but the circuit that it is on is pretty full. These four outlets will be GFIs as well as the new circuit itself.
I'm not really sure if there is anything else that can be done. Is there?
Thoughts on the outlet for the lights? I don't even have lights picked out yet, but I think I they will be suspended from the ceiling. My hope is to make the power cords as invisible as possible. The tank is euro braced. My unresearched assumption is suspension is my only option.
Thanks
Other pre projects include swapping out the sink in the half bath around the corner for a deep utility sink, (Somehow I am still in a relationship after that proposal) and setting up my RODI system in the coat closet. (Again, she remains oddly supportive)
Stay tuned!
I'm not really sure if there is anything else that can be done. Is there?
Thoughts on the outlet for the lights? I don't even have lights picked out yet, but I think I they will be suspended from the ceiling. My hope is to make the power cords as invisible as possible. The tank is euro braced. My unresearched assumption is suspension is my only option.
Thanks
Other pre projects include swapping out the sink in the half bath around the corner for a deep utility sink, (Somehow I am still in a relationship after that proposal) and setting up my RODI system in the coat closet. (Again, she remains oddly supportive)
Stay tuned!