nyknicks4412
New member
I am plumbing a tank for the firs time and just have a few questions...the tank is a 20 gallon long with a glass holes overflow and return kit.
I will be using regular schedule 40 pvc pipe and fittings. The overflow is 1" and the return is 1/2".
The design is extremely simple the overflow feeds down from the overflow into a filter sock and the return is straight out of a mag 3 and into the return kit.
I have attached a picture to show the basic design. Both sides are the same. Just 2 90* elbows.
My question is: do I need anything else besides elbows for this? I have purchased four unions, two for the overflow and two for the return and am unsure where they should go into this? I was thinking of possibly placing unions directly before the pipes going to the tank and directly before they enter the sump to make break down and maintenance easy. Would this work?
Do I need anything else? My pump doesn't need to be throttled so I didn't purchase any valves but I can if they are needed
I will be using regular schedule 40 pvc pipe and fittings. The overflow is 1" and the return is 1/2".
The design is extremely simple the overflow feeds down from the overflow into a filter sock and the return is straight out of a mag 3 and into the return kit.
I have attached a picture to show the basic design. Both sides are the same. Just 2 90* elbows.
My question is: do I need anything else besides elbows for this? I have purchased four unions, two for the overflow and two for the return and am unsure where they should go into this? I was thinking of possibly placing unions directly before the pipes going to the tank and directly before they enter the sump to make break down and maintenance easy. Would this work?
Do I need anything else? My pump doesn't need to be throttled so I didn't purchase any valves but I can if they are needed