I am awaiting the arrival of a new sump I ordered. While I do so I am trying to get the whole process worked out in my head. I was hoping I could get some info here.
Let's assume I have the overflow plumbed to the sump and the return pump hooked up to the returns. The tank and sump are empty and dry, and I am preparing to add the initial water to it. I plan to run just regular tap water for a week or so to make sure no leaks develop, and then drain it, fill with RODI and move forward.
My question is, what is the sequence for adding the water, tuning the flow, etc? Fill the DT until it overflows and fills the sump then kick on the pump? Adjust levels by adding water to the DT, or to the sump? Tune flow by ball valve on the overflow, or by turning the return pump speed up/down...or both? How do I know when I have it right?
Bean animal style overflow in a Synergy Reef 20 inch overflow. Vectra L1 return pump.
This my first tank in 15 years, and my first sump ever. So I'm sweating the details.
Let's assume I have the overflow plumbed to the sump and the return pump hooked up to the returns. The tank and sump are empty and dry, and I am preparing to add the initial water to it. I plan to run just regular tap water for a week or so to make sure no leaks develop, and then drain it, fill with RODI and move forward.
My question is, what is the sequence for adding the water, tuning the flow, etc? Fill the DT until it overflows and fills the sump then kick on the pump? Adjust levels by adding water to the DT, or to the sump? Tune flow by ball valve on the overflow, or by turning the return pump speed up/down...or both? How do I know when I have it right?
Bean animal style overflow in a Synergy Reef 20 inch overflow. Vectra L1 return pump.
This my first tank in 15 years, and my first sump ever. So I'm sweating the details.