Thanks to a few threads I have seen here, I am thinking about floor support under the 48" 125 tank I am trying to put up
I want to use a 18,000 lb. floor jack , set it on solid concrete block and run the jack up under a joist with a 4x4 set perpendicular under the joist . I have crawl space under the house.
Question. Would you do this before or after the tank set up? I just am not sure.
Thanks for your help.
I want to use a 18,000 lb. floor jack , set it on solid concrete block and run the jack up under a joist with a 4x4 set perpendicular under the joist . I have crawl space under the house.
Question. Would you do this before or after the tank set up? I just am not sure.
Thanks for your help.