jpc763
Nothing to see Move along
I have 2 Tunze 6000 hooked up to a 7091 controller and am concerned that I do not have enough flow. They switch between full and about 80%.
I am considering on buying some new transformers to convert them to 6101 models and was wondering if it would be required for me to buy 2 or just 1. I would keep them hooked to the same controller.
Thanks in advance.
I am considering on buying some new transformers to convert them to 6101 models and was wondering if it would be required for me to buy 2 or just 1. I would keep them hooked to the same controller.
Thanks in advance.