I am starting to plumb a 110. It came with a center bottom drilled 1-1/4 overflow, but I installed a CPR overflow and drilled the back for a beananimal set-up. I recovered an old 12 gallon jbj nanocube for a refugium, and have not yet bought a sump.
I am thinking I will have the primary (siphon) overflow going to the skimmer section, and the other wet (non-siphoning) overflow go to the refugium. But I am also considering splitting the siphon to both. Comments?
The nanocube still has the rear partition. I was going to direct the flow into there and let it flow out into the main chamber, but I am having second thoughts about that. I'd also like to gather some feedback on that.
I am thinking I will have the primary (siphon) overflow going to the skimmer section, and the other wet (non-siphoning) overflow go to the refugium. But I am also considering splitting the siphon to both. Comments?
The nanocube still has the rear partition. I was going to direct the flow into there and let it flow out into the main chamber, but I am having second thoughts about that. I'd also like to gather some feedback on that.