Tastee
Member
Hi,
Does anyone out there have a Red Sea Reefer in which they have hard-plumbed their return pump, chiller etc in their sump?
I want to swap the flexible tubing in my Red Sea Reefer 250 over for hard plumbing to a) stop the pumps moving around and b) allow me to fit a reactor, which will be powered by the chiller pump. I would love to see any photos or designs of what others have done to their Reefers.
Here is a photo of my sump - sorry, it's a bit busy!
Sent from my iPad using Tapatalk
Does anyone out there have a Red Sea Reefer in which they have hard-plumbed their return pump, chiller etc in their sump?
I want to swap the flexible tubing in my Red Sea Reefer 250 over for hard plumbing to a) stop the pumps moving around and b) allow me to fit a reactor, which will be powered by the chiller pump. I would love to see any photos or designs of what others have done to their Reefers.
Here is a photo of my sump - sorry, it's a bit busy!

Sent from my iPad using Tapatalk