Some weekend updates with the tank,
1. I removed the Shelf and Workbench, placed a bigger Shelf and now I can hold 5, 25 Gal QT's as well as the 50 Gal, I will take pics of it tomorrow once it's all done.
2. I had a design problem with the sump, the first baffle was too high and it was causing microubbles in the return chamber, second, my water level was too high and in case of a power outage the sump wouldn't hold all the water from the system, so I tried removing the silicon from both sides of this baffle to be able to remove it, no luck, it was very well glued, so next step, I took a hammer..... yes I broke the baffle under water, after one hour of working on removing all pieces attached to the glass, ten cuts on my hand and removing all pieces within the sump I finally have it clear, water is now running lower and no microbubbles in the DT, even just using two baffles.
3. Thoroughly cleaned the Sump, wow it was full of waste, I scrubbed and removed water.
4. Made major water change now using KENT SALTS, tested the batch and nice parameters.
5. Connected my Calcium Reactor, haven't fired up the CO2 as I'm just looking at the effluent drop ML's to calibrate it, I will do this and leave it 24 hours just to be sure the same drip rate hold for that time.
6. Re arranged all sump wiring and outlets connections, happy with the results.
Well, I think lots was done in three days and today hasn't ended LOL.
Pics tomorrow.