OK, it seems I need to get some 1" T's in order to continue on the return lines. Another run tomorrow. Also need to get some 1 1/2" flex tubing. I must say, flex tubing is sooooo much easier to deal with than PVC. No contest.
Now, since working on the 1" lines was out, I decided to start the hole through the wall. Look what I found:
The electrical wire, running smack dab through the middle, at 24", even though the outlet on the other side of the wall is at 16". Shouldn't really matter much, as I can thread the pipes around it, but still, that shouldn't bee there!:mad2:
Also notice the OSB board that is behind the sheetrock in the house. I'll have to wait until tomorrow to cut through that, as everyone is asleep.
You can see where the hole came through in the garage. I've got an 11' run to the fuge setup.
I should at least be able to finish up the CL drain line out to the Sequence 5800 in the garage, and run it back into the house. Then I'll have to make the final decision about the placement of the OM 4 way. If all goes well, I'll get the CL returns finished up as well, but will need to wait for my sump in order to finish the system return lines. I'll need to get the 1.5" line in order to do the fuge drain and skimmer drain lines. Shooting for a leak test over the weekend.