jgraz
New member
Progress:
Tank and stand are in the house
Support wall is was also built and is in place
And this morning I have been working on the light rack. All built in pine to match the stand. This is the same design I used on my 90g except longer obviously.
That's all for now. I should have the rack finished tonight and ready for staining. Thanks for looking.
Tank and stand are in the house

Support wall is was also built and is in place

And this morning I have been working on the light rack. All built in pine to match the stand. This is the same design I used on my 90g except longer obviously.

That's all for now. I should have the rack finished tonight and ready for staining. Thanks for looking.