i just got done taking apart a 55 gal and a 75 gal. (one was missing the bottom, the other leaked about two gal a day)
so after cutting the glass panels free, i cut the nicer pieces down to make a 48" x 20" x 13"h .......
two days of scraping, wire wheeling, and acetone and i finnaly got the edges clean enough for putting back together!
spent a good amount of time taping and cleaning the edges, siliconed it up and relized i didnt tape the outside seams so now it looks hack....
if this thing leaks i am gonna go office space on it.... should have just kicked out the $400 bones for a GC.
anyways just felt like ranting.
so after cutting the glass panels free, i cut the nicer pieces down to make a 48" x 20" x 13"h .......
two days of scraping, wire wheeling, and acetone and i finnaly got the edges clean enough for putting back together!
spent a good amount of time taping and cleaning the edges, siliconed it up and relized i didnt tape the outside seams so now it looks hack....
if this thing leaks i am gonna go office space on it.... should have just kicked out the $400 bones for a GC.
anyways just felt like ranting.