More "third day" photos...
More "third day" photos...
Memorial Day was a long one at lightsluvr's fish room upgrade~
It was a 12 hour day for me, and a 9 hour day for Chris the contractor... here a few more photos:
view of a construction site... (or a redneck's back yard)
Chris let me actually measure some boards...but "Step away from the power tools" was the understood order...
After all wall studs were removed, it was time to install the furring strips, replace the R-19 insulation and sheetrock the ceiling and walls:
Sheetrock and the new raised ceiling:
The (2) 100CFM 1.0 Sone ventilation fans located above the tank position:
This photo shows the outline where the concrete pad for the tank stand will be located:
After studying the combined weight of tank and stand (nearly two tons), Chris recommended removal the existing concrete, excavate for corner piers and pour a new pad. I concurred, so out came the concrete saw and 8 pound sledge hammer...
After Chris wokred on the floor for almost an hour, this is the end result:
Plan: after work today May 25, I will remove the larger concrete rubble form the excavation. I will begin digging for piers at the corner and center of the new pad. The front of the stand will extend into living room. by approximately 6", resting on the main slab and footings. The tank will be viewable through the sides from the living room.
Well, back to work!
LL