demon16v
Don't Ask Me I Don't Know
Solution for the not so “Mega Flowâ€ÂÂ
Solution for the not so ââ"šÂ¬Ã…"œMega Flowââ"šÂ¬Ã‚Â
Hey Merv,
I just got through reading your tread and everything looks great so far.
What I did to get the ââ"šÂ¬Ã…"œMega Flowââ"šÂ¬Ã‚ (not so MEGA) to handle a larger pump was 1. enlarge the overflow, like you already did and 2. used a Dremel with a sanding barrel to open the glass to a larger size, where the bulkheads pass through to the sump. They were both opened up to fit a 1.5 bulkhead. This worked great and only took about 5 min for one hole and about 10-15 for the other. The only down side is you will go through 10-15 sanding barrels.
This was for a 90 gal, duel Dursos, 30gal sump with an Iwaki 70, 1500gph, and with the ball value wide open. I used 2 returns with 1/2 Loc-Line with 2 1/2 fan nozzles also. This setup gave good high flow and water movement.
Iââ"šÂ¬Ã¢"žÂ¢m sure that you donââ"šÂ¬Ã¢"žÂ¢t want to take everything apart again but since it is not stocked I would re due the plumbing and make the Iwaki 40 work. IMO a Iwaki 20 is not enough flow for the return especially when you calculate the head loss from the plumbing.
Solution for the not so ââ"šÂ¬Ã…"œMega Flowââ"šÂ¬Ã‚Â
Hey Merv,
I just got through reading your tread and everything looks great so far.
What I did to get the ââ"šÂ¬Ã…"œMega Flowââ"šÂ¬Ã‚ (not so MEGA) to handle a larger pump was 1. enlarge the overflow, like you already did and 2. used a Dremel with a sanding barrel to open the glass to a larger size, where the bulkheads pass through to the sump. They were both opened up to fit a 1.5 bulkhead. This worked great and only took about 5 min for one hole and about 10-15 for the other. The only down side is you will go through 10-15 sanding barrels.
This was for a 90 gal, duel Dursos, 30gal sump with an Iwaki 70, 1500gph, and with the ball value wide open. I used 2 returns with 1/2 Loc-Line with 2 1/2 fan nozzles also. This setup gave good high flow and water movement.
Iââ"šÂ¬Ã¢"žÂ¢m sure that you donââ"šÂ¬Ã¢"žÂ¢t want to take everything apart again but since it is not stocked I would re due the plumbing and make the Iwaki 40 work. IMO a Iwaki 20 is not enough flow for the return especially when you calculate the head loss from the plumbing.