818
New member
Well after adding some 100 more lbs of live rock, and a PVC Rack, I finally finished my rock work.
You all remember the 2 island, then the rock wall, and now this.
I think I probably lost 5g of water of taking some much rock and rearanging, but now I have much more room for frags and such.
Now my question. How can I hide that tubing in the pic?
Im guessing break some LR and glue it? But with what? What can go on to that tubing and strong enough to hold LR Rubble?
So what do you think? Time to start adding frags!
Picture do no justice Im only using a 36 inch fixture PC lighting from an old set up. Ill be getting my MH in the weekend...Yay!
My Rock work is 22 inches high all the way... With a 1.5ft cave and more cool stuff.
You all remember the 2 island, then the rock wall, and now this.
I think I probably lost 5g of water of taking some much rock and rearanging, but now I have much more room for frags and such.
Now my question. How can I hide that tubing in the pic?
Im guessing break some LR and glue it? But with what? What can go on to that tubing and strong enough to hold LR Rubble?
So what do you think? Time to start adding frags!

Picture do no justice Im only using a 36 inch fixture PC lighting from an old set up. Ill be getting my MH in the weekend...Yay!
My Rock work is 22 inches high all the way... With a 1.5ft cave and more cool stuff.



