ben&bobbi
New member
plumbing layout
plumbing layout
here is what i am planning for the plumbing.
With a great bit of help from Boostable, jay24k, flfirefighter13, Me No Nemo and my boss (a PE) this is the direction i am heading.
The sump - AGA 55gal standard
the first 4" of the sump, where the drains exit, will hold filter socks or rubble - not sure which.
the second section will be the skimmer / heater / ??? area, not too much room with that G3.
the next section will be the return for the Sequence Dart.
the last section will be the refugium.
Dart plumbing -
the inlet will be all 2"
the outlet is all 1.5" up to the 3/4 blkhd that goes through the tank.
this will lead to (2) 3/4" locline, per side.
Drain -
this will be 1.25"
the left return will have a 1" tee off to the refugium with a ball valve.
the right side will have the same to feed the modified G3.
Let me know what you think, before i start gluing and drilling!
thanks
Ben
plumbing layout
here is what i am planning for the plumbing.
With a great bit of help from Boostable, jay24k, flfirefighter13, Me No Nemo and my boss (a PE) this is the direction i am heading.
The sump - AGA 55gal standard
the first 4" of the sump, where the drains exit, will hold filter socks or rubble - not sure which.
the second section will be the skimmer / heater / ??? area, not too much room with that G3.
the next section will be the return for the Sequence Dart.
the last section will be the refugium.
Dart plumbing -
the inlet will be all 2"
the outlet is all 1.5" up to the 3/4 blkhd that goes through the tank.
this will lead to (2) 3/4" locline, per side.
Drain -
this will be 1.25"
the left return will have a 1" tee off to the refugium with a ball valve.
the right side will have the same to feed the modified G3.
Let me know what you think, before i start gluing and drilling!
thanks
Ben
Last edited: