bobafet1
Active member
Here are the latest pics of my setup...I had covered the frame with wood and coated it with some blue paint to make it somewhat water resistant.
after all that was done I started with the drywall
Here the drywall is all done..next I will fill any screw holes and any seems...after that is all done I will texture coat the drywall to match the rest of the walls in the room...and finally repaint to match the existing color scheme....
I will install the tank and still have access from the other side for the components...

after all that was done I started with the drywall

Here the drywall is all done..next I will fill any screw holes and any seems...after that is all done I will texture coat the drywall to match the rest of the walls in the room...and finally repaint to match the existing color scheme....

I will install the tank and still have access from the other side for the components...
