I think I'll have two more 1/2 bulkheads added to opposite corners for the power heads. I can always make them just above the water line, cap them, drill a hole in the cap and seal with silicone. Then I won't have to worry about any leaks and once again, no cords. I talked to Ty and I can bring it back to Boaz and he'll drill them for me.