So i am in the process of plumbing a new system and had a few questions. I am
Building a manifold system that will feed my three media reactors. I was thinking instead of having three tubes from the reactors returning to my sump would it be possible to create another manifold and have one drain going back to the sump.
Feed Manifold -> reactors -> 1/2" lines returning to a 3/4 manifold ->
Sump.
Would something like this work?
Building a manifold system that will feed my three media reactors. I was thinking instead of having three tubes from the reactors returning to my sump would it be possible to create another manifold and have one drain going back to the sump.
Feed Manifold -> reactors -> 1/2" lines returning to a 3/4 manifold ->
Sump.
Would something like this work?