I should receive my Lite 3 package on Monday and was looking for some help programming it from someone who already has theirs setup. I have read through all the sites and can't seem to find the following scenarios.
1-I want to have a pump from my ATO come on 3 times per day for 5 minutes each time. I then want the pump to turn off when the float switch trips. This would occur before the 5 minutes are up. I will have two float switches inline, second one for backup. These would go to one of the SW inputs on the SL1 module.
2-Since I'm using an overflow box, I want to use the second switch input on the SL1 to turn off the return pump if the water in the display gets too high to prevent a flood. This is incase I ever loose siphon on the overflow box.
3-Do you have to calibrate the Itemp probe? I'm assuming you do and you follow the single point calibration method, but what do you set the target data as?
4-For the pH probe, do you set the target data based on the calibration fluid numbers that come with the package?
If anyone has any other tips for setting this up, I would greatly appreciate it. I see the manual is not very clear and would rather learn from others. I will have the following on each channel.
1-Actinic T5 lighting on a timer
2-Main T5 lighting on a timer
3-Fuge lighting on a timer
4-Return Pump on always except for standby mode
5-Heater controlled by the system
6-Skimmer on always
7-ATO pump
8-Display PH's-on always except for standby mode
Thanks for input.
1-I want to have a pump from my ATO come on 3 times per day for 5 minutes each time. I then want the pump to turn off when the float switch trips. This would occur before the 5 minutes are up. I will have two float switches inline, second one for backup. These would go to one of the SW inputs on the SL1 module.
2-Since I'm using an overflow box, I want to use the second switch input on the SL1 to turn off the return pump if the water in the display gets too high to prevent a flood. This is incase I ever loose siphon on the overflow box.
3-Do you have to calibrate the Itemp probe? I'm assuming you do and you follow the single point calibration method, but what do you set the target data as?
4-For the pH probe, do you set the target data based on the calibration fluid numbers that come with the package?
If anyone has any other tips for setting this up, I would greatly appreciate it. I see the manual is not very clear and would rather learn from others. I will have the following on each channel.
1-Actinic T5 lighting on a timer
2-Main T5 lighting on a timer
3-Fuge lighting on a timer
4-Return Pump on always except for standby mode
5-Heater controlled by the system
6-Skimmer on always
7-ATO pump
8-Display PH's-on always except for standby mode
Thanks for input.