Enjoying this thread. Keep it up!
Great to follow along on this thread. Thanks Rocket. I also just finished putting a sump together and will soon start on my plumbing. I'm interested in your plumbing set-up from the T off the return. Could you describe why you branched off as you did rather than a straight line T over to the fuge?
Appreciate it! Also, thanks for the tip on the plastic razor blades. Didn't even know they made those.
180 gl is 6x2x2. the stand i am building is going to be supported by center beam 4x4cherry 6' span with 2 2x4 bolted and glued together one on each side (front) the back is sitting on 6 2x4 (wall), top is 3/4 plywood. i like to avoid the additional support in the center ps it sits 44" high. email luck7773@yahoo.com i can email you pic
Great set-up. Looks like a lot of dyi
I wish I lived near someone who was doing a project this in depth. I can just imagine how much I could learn if I could be a part of it.
I wish I lived near someone who was doing a project this in depth. I can just imagine how much I could learn if I could be a part of it.
Nice work so far Rocket. Going to see if a Electrical Engineer can match your build quality.