I'm currently doing a large system build and I'm trying to feed my frag system (6 3/4" returns) from a 2" SCH 80 pipe.
Build Thread
Started looking at the underside of the frag system and my original design with 2" Tees -> 3/4" Reducer -> 3/4" Ball Valve -> Barbed fitting -> Flex PVC -> Barbed fitting -> Bulkhead is not going to work as just the "2" Tees -> 3/4" Reducer -> 3/4" Ball Valve -> Barbed fitting" portion would be over 12". (Did not realize how big 2" PVC gets while working with it!)
That being said, I think what looks to be the best option at this point is to get a SCH 80 PVC manifold. I need something that takes my 2" PVC feed pipe and distributes to 6 3/4" slips.
I found the following manifolds but they are SCH 40 and curious if anyone is aware of any other manifolds like this that are SCH 80?!?
http://flexpvc.com/cart/agora.cgi?product=PVC-Manifolds
It does not have to have 6 3/4" splits either....I could use multiple ones but looking to find a better solution to what I currently have worked up. It will work but seems a bit drastic!
Build Thread
Started looking at the underside of the frag system and my original design with 2" Tees -> 3/4" Reducer -> 3/4" Ball Valve -> Barbed fitting -> Flex PVC -> Barbed fitting -> Bulkhead is not going to work as just the "2" Tees -> 3/4" Reducer -> 3/4" Ball Valve -> Barbed fitting" portion would be over 12". (Did not realize how big 2" PVC gets while working with it!)
That being said, I think what looks to be the best option at this point is to get a SCH 80 PVC manifold. I need something that takes my 2" PVC feed pipe and distributes to 6 3/4" slips.
I found the following manifolds but they are SCH 40 and curious if anyone is aware of any other manifolds like this that are SCH 80?!?
http://flexpvc.com/cart/agora.cgi?product=PVC-Manifolds
It does not have to have 6 3/4" splits either....I could use multiple ones but looking to find a better solution to what I currently have worked up. It will work but seems a bit drastic!