I just got a new osmolator and during install I noticed the metering pump would create a back siphon from my kalk reactor. I can't change the layout and design of my reservoirs. My suggestion for the metering pump is for a check valve or two to be added to the kit to install with the tubing. For a couple hundred dollar product a couple dollar check valve would be a great addition to the kit. Just a suggestion. Thanks.