Suggestion for osmolator

Bdial

Member
I just got a new osmolator and during install I noticed the metering pump would create a back siphon from my kalk reactor. I can't change the layout and design of my reservoirs. My suggestion for the metering pump is for a check valve or two to be added to the kit to install with the tubing. For a couple hundred dollar product a couple dollar check valve would be a great addition to the kit. Just a suggestion. Thanks.
 
We do include a check valve with our calcium dispenser (kalk reactor), but the osmolator on its own is just a top off and no check valve is needed or useful in a standard top off install so we don't include one.
 
Back
Top