soulpatch New member Jun 26, 2015 #70 I don't know whether to be more impressed with the quality of the work or with the speed at which this all came together.
I don't know whether to be more impressed with the quality of the work or with the speed at which this all came together.
E Elliott New member Jun 26, 2015 #71 soulpatch said: i don't know whether to be more impressed with the quality of the work or with the speed at which this all came together. Click to expand... +1
soulpatch said: i don't know whether to be more impressed with the quality of the work or with the speed at which this all came together. Click to expand... +1
shaggss Active member Jun 26, 2015 #74 All done in 35 degree heat (95 F for americans!) and 80% humidity too!
ryan_ Yeah...Don't touch that. Premium Member Jun 27, 2015 #75 I am now waiting to check this thread at the end of the day. This is very impressive.
BlackTipReef New member Jun 27, 2015 #76 Very nice build so far. I am anxious to see the end product!!! Keep the pics rolling
dirk_brijs Active member Jun 30, 2015 #78 on top of the existing swimming pool sand filter we have installed another 6 UV biological filter units each rated for 13000liters
on top of the existing swimming pool sand filter we have installed another 6 UV biological filter units each rated for 13000liters
dirk_brijs Active member Jun 30, 2015 #79 some more pictures now most of the above water level work is completed
dirk_brijs Active member Jun 30, 2015 #80 some more from the top some of the plants that will be used through the project now