kegogut
Active member
Might take longer than 5 days to fill up. I have the tubing from the RO/DI unit going to the ceiling and over to the tank,only problem is that its slowed the output of the unit considerably. Down to a steady drip. I think its only made 5 gallons in the past 12 hours. I might end up just letting it fill the barrel and then emptying the barrel a few times. I think thats going to be my best bet.
Last edited:


