I'm looking to leverage the Tunze leads to operate a W/C system in conjunction with the Tunze ATO. Pardon my ignorance on the electrical front, but can the wires from the Tunze be plugged into the Breakout box directly or is some converter or relay required? If a relay is required, any recommendations?
Ultimately, I'm looking to do this...
1. Disable ATO pump [Tunze switch OPEN]
2. Activate waste water pump from sump [Tunze switch CLOSED]
3. Deactivate waste water pump when sump low float switch OPEN (~2 gallons) [Tunze switch still CLOSED]
4. DEFER low float switch for 10 minutes
5. Activate NSW pump [Tunze switch still CLOSED]
6. Deactivate NSW pump [Tunze switch OPEN]
7. Enable ATO pump
Am I thinking this through correctly? It's better to have the APEX control everything in this application, yeah? However, if I'm borrowing the Tunze pump signal, how do I activate this via APEX?
Ultimately, I'm looking to do this...
1. Disable ATO pump [Tunze switch OPEN]
2. Activate waste water pump from sump [Tunze switch CLOSED]
3. Deactivate waste water pump when sump low float switch OPEN (~2 gallons) [Tunze switch still CLOSED]
4. DEFER low float switch for 10 minutes
5. Activate NSW pump [Tunze switch still CLOSED]
6. Deactivate NSW pump [Tunze switch OPEN]
7. Enable ATO pump
Am I thinking this through correctly? It's better to have the APEX control everything in this application, yeah? However, if I'm borrowing the Tunze pump signal, how do I activate this via APEX?